Frouzis Bridge
in Northern Crete Motorway |
|
The formwork carrier approaches
midspan for full-span connection |
Click on the
image to see
the enlargement |
|
|
Balanced cantilever construction
of
superstructure symmetrically to pier M1 |
Click on the image to see
the enlargement |
|
|
Completed bridge |
Click on the
image to see
the enlargement |
|
PROJECT:
|
Frouzis Bridge in Northern Crete Motorway |
PROJECT OWNER:
|
Ministry of Environment, Physical Planning and Public Works |
DESIGNER:
|
TO.P.P.O.S. S.A. |
SUPERVISING
AUTHORITY:
|
MPW/VOAK Direction |
CONTRACTOR:
|
ERGOKAT S.A. |
LOCATION:
|
Lasithi Prefecture, North region |
PROJECT
CHARACTERISTICS:
|
Pile foundation. Spans: 44,5 +71,3 + 44,5 m. Structure type:
continuous, hollow – box section of variable height (2,5 - 5,0
m), deck width 14,5 m, made of C30/37 post tensioned concrete.
Superstructure was analyzed for the application of balanced
cantilever construction method. |
PROJECT BUDGET:
|
2.600.000 € ( D 99) |
|
|
|